SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
LINEAR SCHEDULING AND VISUALIZATION
0 references·10 citing·32 second hop
LINEAR SCHEDULING AND VISUALIZATION (1992)LINEAR SCHEDULING AND VISUALIZATIONEnhanced Repetitive-Scheduling Computation and Visualization (2020)Enhanced Repetitive-Schedulin…Resource Leveling Based on Line of Balance and Constraint Programming (2018)Resource Leveling Based on Li…Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling (2013)Challenges and opportunities …Linear Scheduling Model with Varying Production Rates (2010)Linear Scheduling Model with …Resource-constrained scheduling for continuous repetitive projects with time-based production units (2009)Resource-constrained scheduli…Float Types in Linear Schedule Analysis with Singularity Functions (2009)Float Types in Linear Schedul…Planning and Scheduling Highway Construction (2004)Planning and Scheduling Highw…Resource-Driven Scheduling for Repetitive Projects: A Pull-System Approach (2001)Resource-Driven Scheduling fo…Linear Scheduling Model: Float Characteristics (2001)Linear Scheduling Model: Floa…Linear scheduling: past research efforts and future directions (1998)Linear scheduling: past resea…Linear Scheduling Model: Development of Controlling Activity Path (1998)Scheduling Projects with Repeating Activities (1998)Challenges in Line-of-Balance Scheduling (2002)Optimizing Cash Flows for Linear Schedules Modeled with Singularity Functions by Simulated Annealing (2010)Real World Research: A Resource for Social Scientists and Practitioner-Researchers (1993)Qualitative metasynthesis: Issues and techniques (1997)Five Misunderstandings About Case-Study Research (2004)Improving workflow and resource usage in construction schedules through location-based management system (LBMS) (2018)RPM: Repetitive Project Modeling (1990)Scheduling/Cost Optimization and Neural Dynamics Model for Construction (1997)Simultaneous multi-criteria optimization for scheduling linear infrastructure projects (2018)Resource-Constrained Time-Cost Tradeoff for Repetitive Construction Projects (2019)Professional Construction Management (1976)Planning and analysis of construction operations (1992)A new approach for automation of location-based earthwork scheduling in road construction projects (2014)Improved Strategy for Resource Allocation in Repetitive Projects Considering the Learning Effect (2014)Linear Scheduling Method for Highway Construction (1981)Application of Linear Scheduling (1986)ALISS: Advanced Linear Scheduling System (2006)Planning and design models for construction industry: A critical survey (2011)Two-Stage Scheduling Model for Resource Leveling of Linear Projects (2014)Earthmoving Productivity Estimation Using Linear Regression Techniques (1999)Impact of Rainfall on the Productivity of Highway Construction (2001)Building contractors’ behavioural pattern in pricing weather risks (2007)Impact of pre‐construction planning and project characteristics on performance in the US electrical construction industry (2008)Schedule optimization for scattered repetitive projects (2021)Parade Game: Impact of Work Flow Variability on Trade Performance (1999)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)Project scheduling with finite or infinite number of activity processing modes – A survey (2010)Multiobjective Optimization Model for Planning Repetitive Construction Projects (2021)Line‐of‐Balance Scheduling in Pavement Construction (1986)Linear Optimization Model to Minimize Total Cost of Repetitive Construction Projects and Identify Order of Units (2021)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2004Planning and Scheduling Highway Construction50 cited
  • 2010Linear Scheduling Model with Varying Production Rates49 cited
  • 2013Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling48 cited
  • 2001Linear Scheduling Model: Float Characteristics48 cited
  • 1998Linear scheduling: past research efforts and future directions42 cited
  • 2020Enhanced Repetitive-Scheduling Computation and Visualization40 cited
  • 2009Resource-constrained scheduling for continuous repetitive projects with time-based production units38 cited
  • 2009Float Types in Linear Schedule Analysis with Singularity Functions35 cited
  • 2018Resource Leveling Based on Line of Balance and Constraint Programming34 cited
  • 2001Resource-Driven Scheduling for Repetitive Projects: A Pull-System Approach34 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work