2 Accuracy in estimating
0 references·5 citing·19 second hop
2 Accuracy in estimating (2005)2 Accuracy in estimatingThe Accuracy of Hybrid Estimating Approaches: A Case Study of an Australian State Road & Traffic Authority (2010)The Accuracy of Hybrid Estima…Risk factors leading to cost overrun in the delivery of highway construction projects (2006)Risk factors leading to cost …Cost modelling of office buildings in Hong Kong: an exploratory study (2005)Cost modelling of office buil…A method for estimating labour requirements and costs for international construction projects at inception (1998)A method for estimating labou…Experiential learning in cost estimating (1994)Experiential learning in cost…The Framing of Decisions and the Psychology of Choice (1981)Case Study Research: Design and Methods (1984)Focus Groups as Qualitative Research (1997)Predicting likelihood of cost overrun in educational projects (2017)Prospect Theory: An Analysis of Decision under Risk (1979)Prospect theory: An analysis of decision under risk (1988)Megaprojects and Risk (2003)Experiential Learning : Experience as the Source of Learning and Development (1983)Reflection, turning experience into learning (1985)The Reflective Practitioner: How Professionals Think in Action (1985)Historical analysis of the economic life-cycle performance of public school buildings (2019)Predesign Cost-Estimation Function for Buildings (1974)Forecast models for actual construction time and cost (2003)Statistical Methods for Organizational Research (2004)Evaluation of non-cost factors affecting the life cycle cost: an exploratory study (2016)Machine Learning Applications in Facility Life-Cycle Cost Analysis: A Review (2019)Composite property price index forecasting with neural networks (2023)Estimating, Tendering and Bidding for Construction (1995)Productivity rates and construction methods for high rise concrete construction: a comparative evaluation of UK, German and French contractors (1999)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2005Cost modelling of office buildings in Hong Kong: an exploratory study42 cited
  • 2006Risk factors leading to cost overrun in the delivery of highway construction projects36 cited
  • 1994Experiential learning in cost estimating34 cited
  • 2010The Accuracy of Hybrid Estimating Approaches: A Case Study of an Australian State Road & Traffic Authority33 cited
  • 1998A method for estimating labour requirements and costs for international construction projects at inception30 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work