SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Do Planners Get it Right? The Accuracy of Travel Demand Forecasting in Norway
8 references·16 citing·46 second hop
Do Planners Get it Right? The Accuracy of Travel Demand Forecasting in Norway (2011)Do Planners Get it Right? The Accuracy of…What Determines Decision‐Makers’ Preferences for Road Investments? Evidence from the Norwegian Road Sector (2010)What Determines Decision‐Make…Policy And Planning For Large Infrastructure Projects : Problems, Causes, Cures (2005)Policy And Planning For Large…Measuring inaccuracy in travel demand forecasting: methodological considerations regarding ramp up and sampling (2005)Measuring inaccuracy in trave…How (In)accurate Are Demand Forecasts in Public Works Projects?: The Case of Transportation (2005)How (In)accurate Are Demand F…Cost overruns in road construction—what are their sizes and determinants? (2003)Cost overruns in road constru…Ranking of regional road investment in Norway (1996)Ranking of regional road inve…Empirical evidence on induced traffic (1996)Empirical evidence on induced…Uncertainty in traffic forecasts: literature review and new results for The NetherlandsUncertainty in traffic foreca…Traffic forecast inaccuracy in transportation: a literature review of roads and railways projects (2019)Traffic forecast inaccuracy i…The accuracy of benefit-cost analyses (BCAs) in transportation: An ex-post evaluation of road projects (2019)The accuracy of benefit-cost …Revenue-risk-sharing approaches for public-private partnership provision of highway facilities (2018)Revenue-risk-sharing approach…critical assessment of discounting policies for transport Cost-Benefit Analysis in five European practices (2018)critical assessment of discou…The accuracy of toll road traffic forecasts: An econometric evaluation (2017)The accuracy of toll road tra…TRANSPORT PROJECT EVALUATION: FEASIBILITY RISK ASSESSMENT AND SCENARIO FORECASTING (2015)TRANSPORT PROJECT EVALUATION:…Forecasting inaccuracies: a result of unexpected events, optimism bias, technical problems, or strategic misrepresentation? (2015)Forecasting inaccuracies: a r…Transport modelling in the context of the ‘predict and provide’ paradigm (2014)Transport modelling in the co…Roads to nowhere: The accuracy of travel demand forecasts for do-nothing alternatives (2014)Roads to nowhere: The accurac…Imagineering Mobility: Constructing Utopias for Future Urban Transport (2014)Imagineering Mobility: Constr…Ex-PostEvaluations of Demand Forecast Accuracy: A Literature Review (2014)Ex-PostEvaluations of Demand …Accounting for the inaccuracies in demand forecasts and construction cost estimations in transport project evaluation (2014)Accounting for the inaccuraci…Hubris or humility? Accuracy issues for the next 50 years of travel demand modeling (2013)Hubris or humility? Accuracy …Traffic Forecasts Ignoring Induced Demand: a Shaky Fundament for Cost-Benefit Analyses (2012)Traffic Forecasts Ignoring In…Modelling of Transport Project Uncertainties: Feasibility Risk Assessment and Scenario Analysis (2012)Modelling of Transport Projec…Forecasts: Fact or Fiction? Uncertainty and Inaccuracy in Transport Project Evaluation (2012)Forecasts: Fact or Fiction? U…Conditional logit analysis of qualitative choice behavior (1972)Urban Travel Demand: A Behavioral Analysis (1977)Discrete Choice Analysis: Theory and Application to Travel Demand. (1987)The barely revealed preference behind road investment priorities (1997)Random Coefficient Models for Stated Preference Surveys (2000)Cost overruns and demand shortfalls – Deception or selection? (2013)Availability: A heuristic for judging frequency and probability (1973)The sustainable mobility paradigm (2007)Thinking, Fast and Slow (2011)Does uncertainty make cost-benefit analyses pointless? (2016)Delusions of success: Costs and demand of high-speed rail in Italy and Spain (2018)Developing the Integrated Marketing Communication (IMC) through Social Media (SM): The Modern Marketing Communication Approach (2022)Ethics and Advocacy in Forecasting for Public Policy (1990)Megaprojects and Risk (2003)Cost Overruns and Demand Shortfalls in Urban Rail and Other Infrastructure (2007)Cost Overruns in Large-scale Transportation Infrastructure Projects: Explanations and Their Theoretical Embeddedness (2010)Quality control and due diligence in project management: Getting decisions right by taking the outside view (2012)Discrete choice analysis: Theory and application to travel demand (1988)Attitudes towards the role of Cost–Benefit Analysis in the decision-making process for spatial-infrastructure projects: A Dutch case study (2013)Ethical Theories and the Cost–Benefit Analysis-BasedEx AnteEvaluation of Transport Policies and Plans (2013)Applied Discrete-Choice Modelling (2018)Prospect Theory: An Analysis of Decision under Risk (1979)Heuristics and Biases (2002)From Nobel Prize to Project Management: Getting Risks Right (2006)Survival of the unfittest: why the worst infrastructure gets built--and what we can do about it (2009)Should we build more large dams? The actual costs of hydropower megaproject development (2014)Underestimating Costs in Public Works Projects: Error or Lie? (2002)Analysis of cost and schedule performance of international development projects (2009)Flexible contracts to cope with uncertainty in public–private partnerships (2012)Discrete Choice Analysis (1985)Discrete Choice Methods with Simulation (2001)Defining Uncertainty: A Conceptual Basis for Uncertainty Management in Model-Based Decision Support (2003)Post-Construction Evaluation of Traffic Forecast Accuracy (2010)Calculating errors for measures derived from choice modelling estimates (2011)Uncertainty in travel demand forecasting models: literature review and research agenda (2012)Concepts of Price Elasticities of Transport Demand and Recent Empirical Estimates: An Interpretative Survey (2005)The Myth of Travel Time Saving (2008)Managing network mobility with tradable credits (2010)Human Settlements, Infrastructure and Spatial Planning (2014)Unrealistic optimism about future life events. (1980)Heuristics and Biases: The Psychology of Intuitive Judgment (2004)Effects of urban road capacity expansion – Experiences from two Norwegian cases (2019)Induced Vehicle Travel in the Environmental Review Process (2020)Stakeholder management studies in mega construction projects: A review and future directions (2014)Front-end definition of projects: Ten paradoxes and some reflections regarding project management and project governance (2015)Getting the territory right: infrastructure-led development and the re-emergence of spatial planning strategies (2019)
this work references cited by second hop

References

  • 2005How (In)accurate Are Demand Forecasts in Public Works Projects?: The Case of Transportation731 cited
  • 2005Policy And Planning For Large Infrastructure Projects : Problems, Causes, Cures522 cited
  • 2003Cost overruns in road construction—what are their sizes and determinants?385 cited
  • 1996Empirical evidence on induced traffic362 cited
  • n.d.Uncertainty in traffic forecasts: literature review and new results for The Netherlands123 cited
  • 2005Measuring inaccuracy in travel demand forecasting: methodological considerations regarding ramp up and sampling111 cited
  • 2010What Determines Decision‐Makers’ Preferences for Road Investments? Evidence from the Norwegian Road Sector85 cited
  • 1996Ranking of regional road investment in Norway70 cited

Cited by

  • 2014Ex-PostEvaluations of Demand Forecast Accuracy: A Literature Review66 cited
  • 2012Traffic Forecasts Ignoring Induced Demand: a Shaky Fundament for Cost-Benefit Analyses64 cited
  • 2019The accuracy of benefit-cost analyses (BCAs) in transportation: An ex-post evaluation of road projects51 cited
  • 2014Imagineering Mobility: Constructing Utopias for Future Urban Transport51 cited
  • 2014Accounting for the inaccuracies in demand forecasts and construction cost estimations in transport project evaluation50 cited
  • 2013

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Hubris or humility? Accuracy issues for the next 50 years of travel demand modeling
38 cited
  • 2018Revenue-risk-sharing approaches for public-private partnership provision of highway facilities37 cited
  • 2012Forecasts: Fact or Fiction? Uncertainty and Inaccuracy in Transport Project Evaluation35 cited
  • 2019Traffic forecast inaccuracy in transportation: a literature review of roads and railways projects34 cited
  • 2017The accuracy of toll road traffic forecasts: An econometric evaluation34 cited
  • 2018critical assessment of discounting policies for transport Cost-Benefit Analysis in five European practices32 cited
  • 2014Transport modelling in the context of the ‘predict and provide’ paradigm27 cited
  • 2014Roads to nowhere: The accuracy of travel demand forecasts for do-nothing alternatives26 cited
  • 2015TRANSPORT PROJECT EVALUATION: FEASIBILITY RISK ASSESSMENT AND SCENARIO FORECASTING26 cited
  • 2015Forecasting inaccuracies: a result of unexpected events, optimism bias, technical problems, or strategic misrepresentation?25 cited
  • 2012Modelling of Transport Project Uncertainties: Feasibility Risk Assessment and Scenario Analysis25 cited