SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Predicting Cost Overrun in Construction Projects
16 references·0 citing·33 second hop
Predicting Cost Overrun in Construction Projects (2015)Predicting Cost Overrun in Construction P…A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects (2010)A CBR-based hybrid model for …Predicting Construction Cost Using Multiple Regression Techniques (2006)Predicting Construction Cost …Factors affecting cost performance: evidence from Indian construction projects (2005)Factors affecting cost perfor…Probabilistic Model for Cost Contingency (2003)Probabilistic Model for Cost …Predicting Cost Deviation in Reconstruction Projects: Artificial Neural Networks versus Regression (2003)Predicting Cost Deviation in …Predicting Accuracy of Early Cost Estimates Using Factor Analysis and Multivariate Regression (2003)Predicting Accuracy of Early …Predicting Accuracy of Early Cost Estimates Based on Estimate Quality (2001)Predicting Accuracy of Early …Determining Sample Size (2000)Determining Sample SizeEvaluation of factors affecting time and cost performance in Hong Kong building projects (1999)Evaluation of factors affecti…Neural Network Model for Parametric Cost Estimation of Highway Projects (1998)Neural Network Model for Para…Identification and evaluation of factors influencing variations on building projects (1997)Identification and evaluation…Factors influencing construction time and cost overruns on high-rise projects in Indonesia (1997)Factors influencing construct…Risk Management Perceptions and Trends of U.S. Construction (1995)Risk Management Perceptions a…Questionnaire Design, Interviewing and Attitude Measurement (1993)Questionnaire Design, Intervi…The survey research handbook (1990)The survey research handbookThe Survey Research Handbook (1985)The Survey Research HandbookThe essentials of factor analysis (1970)A comparative study of causes of time overruns in Hong Kong construction projects (1997)Critical Success Factors for Different Project Objectives (1999)FACTORS AFFECTING THE PERFORMANCE OF CONSTRUCTION PROJECTS IN THE GAZA STRIP (2009)Cost and time control of construction projects: inhibiting factors and mitigating measures in practice (2010)Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects (2015)Introduction to Factor Analysis: What It Is and How to Do It. (1980)Modelling global risk factors affecting construction cost performance (2003)Significant factors causing delay in the UAE construction industry (2006)Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries (2008)Cost Studies of Buildings (2013)Project cost risk analysis: A Bayesian networks approach for modeling dependencies between cost items (2014)Artificial Intelligence and Parametric Construction Cost Estimate Modeling: State-of-the-Art Review (2019)Comparison of Artificial Intelligence Techniques for Project Conceptual Cost Prediction: A Case Study and Comparative Analysis (2020)LEADER-MEMBER EXCHANGE AND SUPERVISOR CAREER MENTORING AS COMPLEMENTARY CONSTRUCTS IN LEADERSHIP RESEARCH. (1994)Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects (2002)Measuring Resilience Potential: An Adaptive Strategy for Organizational Crisis Planning (2009)Collecting data using a semi‐structured interview: a discussion paper (1994)Survey research in operations management: a process‐based perspective (2002)Selecting, designing, and developing your questionnaire (2004)Design documents quality in the Japanese construction industry: factors influencing and impacts on construction process (2003)Risks faced by Singapore firms when undertaking construction projects in India (2005)Interpreting risk allocation mechanism in public–private partnership projects: an empirical study in a transaction cost economics perspective (2008)Predicting construction cost overruns using text mining, numerical data and ensemble classifiers (2014)Cost estimation and prediction in construction projects: a systematic review on machine learning techniques (2020)Code Saturation Versus Meaning Saturation (2016)Characterising and justifying sample size sufficiency in interview-based studies: systematic analysis of qualitative health research over a 15-year period (2018)Purposive sampling: complex or simple? Research case examples (2020)A neural network approach for early cost estimation of structural systems of buildings (2004)Evaluation of Risk Factors Leading to Cost Overrun in Delivery of Highway Construction Projects (2010)Cultural rural tourism (2003)HANDLING NONRESPONSE IN LOGISTICS RESEARCH (2010)Examining non-response bias in substance use research—Are late respondents proxies for non-respondents? (2013)
this work references cited by second hop

References

  • 1993Questionnaire Design, Interviewing and Attitude Measurement4,974 cited
  • 2000Determining Sample Size3,240 cited
  • 1990The survey research handbook1,024 cited
  • 1997Factors influencing construction time and cost overruns on high-rise projects in Indonesia699 cited
  • 2005Factors affecting cost performance: evidence from Indian construction projects506 cited
  • 1985The Survey Research Handbook391 cited
  • 1998Neural Network Model for Parametric Cost Estimation of Highway Projects329 cited
  • 2006Predicting Construction Cost Using Multiple Regression Techniques292 cited
  • 2003Predicting Accuracy of Early Cost Estimates Using Factor Analysis and Multivariate Regression291 cited
  • 1995Risk Management Perceptions and Trends of U.S. Construction194 cited
  • 2001Predicting Accuracy of Early Cost Estimates Based on Estimate Quality166 cited
  • 2003Predicting Cost Deviation in Reconstruction Projects: Artificial Neural Networks versus Regression142 cited
  • 1999Evaluation of factors affecting time and cost performance in Hong Kong building projects123 cited
  • 2010A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects119 cited
  • 1997

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Identification and evaluation of factors influencing variations on building projects
96 cited
  • 2003Probabilistic Model for Cost Contingency89 cited
  • Cited by

    No citing works inside the corpus for this window.