SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Network analysis for planning and scheduling
0 references·6 citing·29 second hop
Network analysis for planning and scheduling (1970)Network analysis for planning and schedul…The risk of delay of a project in terms of the morphology of its network (1999)The risk of delay of a projec…The validity of the triangular distribution assumption in Monte Carlo simulation of construction costs: empirical evidence from Hong Kong (1995)The validity of the triangula…Monte Carlo simulation of construction costs using subjective data (1995)Monte Carlo simulation of con…Critical path analysis and resource constrained project scheduling — Theory and practice (1985)Critical path analysis and re…Project Network Summary Measures Constrained- Resource Scheduling (1975)Project Network Summary Measu…Advances in Critical Path Methods (1966)Advances in Critical Path Met…Application of a Technique for Research and Development Program Evaluation (1959)Critical-Path Planning and Scheduling (1959)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Minimum Moment Method for Resource Leveling Using Entropy Maximization (2009)Scheduling Resource-Constrained Projects with Ant Colony Optimization Artificial Agents (2009)An Artificial Immune Algorithm for the project scheduling problem under resource constraints (2010)Network Analysis in Geography (1970)An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints (1971)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)On the measurement of complexity in activity networks (1980)USING A LATE‐START RESOURCE‐CONSTRAINED PROJECT SCHEDULE TO IMPROVE PROJECT NET PRESENT VALUE* (1987)An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem (2013)Letter to the Editor—The PERT Model for the Distribution of an Activity Time (1962)Activity networks: Project planning and control by network models (1977)A random generator of resource-constrained multi-project network problems (2009)Robust Project Scheduling (2009)A project scheduling approach to production planning with feeding precedence relations (2010)Monte Carlo Technique with Correlated Random Variables (1992)Statistical Properties of Construction Duration Data (1992)Risk Management and Construction (1993)Model for Evaluating Networks under Correlated Uncertainty—NETCOR (2000)Probabilistic simulation for developing likelihood distribution of engineering project cost (2009)Construction cost analysis under uncertainty with correlated cost risk analysis model (2010)Project management with CPM and PERT (1965)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach (1993)Application of Petri Nets and a Genetic Algorithm to Multi-Mode Multi-Resource Constrained Project Scheduling (2001)Adaptive resource allocation in multimodal activity networks (2003)Distributions and correlations in Monte Carlo simulation (1997)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 1975Project Network Summary Measures Constrained- Resource Scheduling87 cited
  • 1995The validity of the triangular distribution assumption in Monte Carlo simulation of construction costs: empirical evidence from Hong Kong81 cited
  • 1966Advances in Critical Path Methods71 cited
  • 1985Critical path analysis and resource constrained project scheduling — Theory and practice71 cited
  • 1995Monte Carlo simulation of construction costs using subjective data68 cited
  • 1999The risk of delay of a project in terms of the morphology of its network67 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work