SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Activity nets: A guided tour through some recent developments
13 references·16 citing·32 second hop
Activity nets: A guided tour through some recent developments (1995)Activity nets: A guided tour through some…Project management : a systems approach to planning, scheduling, and controlling (1995)Project management : a system…The Analysis of Activity Networks Under Generalized Precedence Relations (GPRs) (1992)The Analysis of Activity Netw…A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)A Branch-and-Bound Procedure …AN ALGORITHM FOR A GENERAL CLASS OF PRECEDENCE AND RESOURCE CONSTRAINED SCHEDULING PROBLEMS (1989)AN ALGORITHM FOR A GENERAL CL…Advances in Project Scheduling (1989)Advances in Project SchedulingProject scheduling with resource constraints: A branch and bound approach (1987)Project scheduling with resou…Multiple Resource–Constrained Scheduling Using Branch and Bound (1978)Multiple Resource–Constrained…An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems (1978)An Efficient Integer Programm…Activity networks: Project planning and control by network models (1977)Activity networks: Project pl…Solving Resource-Constrained Network Problems by Implicit Enumeration—Nonpreemptive Case (1970)Solving Resource-Constrained …Project management with CPM and PERT (1965)Project management with CPM a…Critical-Path Planning and Scheduling: Mathematical Basis (1961)Critical-Path Planning and Sc…A Network Flow Computation for Project Cost Curves (1961)A Network Flow Computation fo…Going to the core of hard resource-constrained project scheduling instances (2020)Going to the core of hard res…A hybrid project scheduling and material ordering problem: Modeling and solution algorithms (2017)A hybrid project scheduling a…How Robust Is Your Project? From Local Failures to Global Catastrophes: A Complex Networks Approach to Project Systemic Risk (2015)How Robust Is Your Project? F…Product Development Process Modeling: State of the Art and Classification (2013)Product Development Process M…Project Management with Dynamic Scheduling (2012)Project Management with Dynam…A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations (2009)A parameter-tuned genetic alg…A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags (2007)A mathematical model for the …Discrete–continuous project scheduling with discounted cash flows—A tabu search approach (2006)Discrete–continuous project s…The Project Scheduling Game (PSG): Simulating Time/Cost Trade-Offs in Projects (2005)The Project Scheduling Game (…Reusable Design Processes via Modular, Executable, Decision-Centric Templates (2004)Reusable Design Processes via…Designing Design Processes in Product Lifecycle Management: Research Issues and Strategies (2004)Designing Design Processes in…Project scheduling with inventory constraints (2003)Project scheduling with inven…Project Scheduling with Time Windows (2002)Project Scheduling with Time …A review of the contribution of Operational Research to Project Management (2002)A review of the contribution …Integrated project scheduling and material planning with variable activity duration and rewards (2001)Integrated project scheduling…On the optimal management of project risk (1998)On the optimal management of …Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)A survey on the resource-constrained project scheduling problem (1995)A branch and bound algorithm for the resource-constrained project scheduling problem (1998)An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation (1998)Application of a Technique for Research and Development Program Evaluation (1959)Critical-path planning and scheduling (1959)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)An Efficient Branch and Bound Algorithm for the Warehouse Location Problem (1972)An Efficient Branch and Bound Algorithm for the Capacitated Warehouse Location Problem (1977)Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem (1995)Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm (1998)A random key based genetic algorithm for the resource constrained project scheduling problem (2007)Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time (1984)An investigation into the fundamentals of critical chain project scheduling (2001)The role of project management in achieving project success (1996)Criteria of project success: an exploratory re-examination (1999)Current practice in project management — an empirical study (2002)Resource-constrained project scheduling: A survey of recent developments (1998)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)An integrated survey of deterministic project scheduling (2001)A competitive genetic algorithm for resource-constrained project scheduling (1998)A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)The discrete time-cost tradeoff problem revisited (1995)Project management with time, cost, and quality considerations (1996)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)Resource-constrained project scheduling by simulated annealing (1996)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)Project network models with discounted cash flows a guided tour through recent developments (1997)An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes (2008)An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances (2013)
this work references cited by second hop

References

  • 1995Project management : a systems approach to planning, scheduling, and controlling3,100 cited
  • 1961Critical-Path Planning and Scheduling: Mathematical Basis902 cited
  • 1992A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem606 cited
  • 1977Activity networks: Project planning and control by network models575 cited
  • 1987Project scheduling with resource constraints: A branch and bound approach377 cited
  • 1961A Network Flow Computation for Project Cost Curves366 cited
  • 1965Project management with CPM and PERT305 cited
  • 1978Multiple Resource–Constrained Scheduling Using Branch and Bound250 cited
  • 1978An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems209 cited
  • 1989Advances in Project Scheduling196 cited
  • 1989AN ALGORITHM FOR A GENERAL CLASS OF PRECEDENCE AND RESOURCE CONSTRAINED SCHEDULING PROBLEMS163 cited
  • 1992The Analysis of Activity Networks Under Generalized Precedence Relations (GPRs)156 cited
  • 1970Solving Resource-Constrained Network Problems by Implicit Enumeration—Nonpreemptive Case146 cited

Cited by

  • 2002A review of the contribution of Operational Research to Project Management113 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 2012Project Management with Dynamic Scheduling105 cited
  • 2003Project scheduling with inventory constraints103 cited
  • 1998On the optimal management of project risk84 cited
  • 2001Integrated project scheduling and material planning with variable activity duration and rewards75 cited
  • 2009A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations62 cited
  • 2007A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags61 cited
  • 2006Discrete–continuous project scheduling with discounted cash flows—A tabu search approach57 cited
  • 2005The Project Scheduling Game (PSG): Simulating Time/Cost Trade-Offs in Projects52 cited
  • 2002Project Scheduling with Time Windows51 cited
  • 2017A hybrid project scheduling and material ordering problem: Modeling and solution algorithms46 cited
  • 2020Going to the core of hard resource-constrained project scheduling instances42 cited
  • 2015How Robust Is Your Project? From Local Failures to Global Catastrophes: A Complex Networks Approach to Project Systemic Risk36 cited
  • 2004Reusable Design Processes via Modular, Executable, Decision-Centric Templates23 cited
  • 2004Designing Design Processes in Product Lifecycle Management: Research Issues and Strategies20 cited
  • 2013Product Development Process Modeling: State of the Art and Classification11 cited