A multi-objective resource allocation problem in PERT networks
16 references·1 citing·33 second hop
A multi-objective resource allocation problem in PERT networks (2005)A multi-objective resource allocation pro…Optimal procedures for the discrete time/cost trade-off problem in project networks (1996)Optimal procedures for the di…Multiple Objective Decision Making (1994)Multiple Objective Decision M…Resource allocation via dynamic programming in activity networks (1993)Resource allocation via dynam…Markov and Markov-Regenerative pert Networks (1986)Markov and Markov-Regenerativ…Project Scheduling with Continuously-Divisible, Doubly Constrained Resources (1981)Project Scheduling with Conti…Multiple Objective Decision Making — Methods and Applications (1979)Multiple Objective Decision M…Estimating the Mean and Variance of Subjective Distributions in PERT and Decision Analysis (1975)Estimating the Mean and Varia…A Dynamic Programming Solution to Cost-Time Tradeoff for CPM (1975)A Dynamic Programming Solutio…Critical Path Problems with Concave Cost-Time Curves (1972)Critical Path Problems with C…Conditional Monte Carlo: A Simulation Technique for Stochastic Network Analysis (1971)Conditional Monte Carlo: A Si…On the Expected Duration of PERT Type Networks (1967)On the Expected Duration of P…Distribution of the Time Through a Directed, Acyclic Network (1965)Distribution of the Time Thro…Critical Path Analyses Via Chance Constrained and Stochastic Programming (1964)Critical Path Analyses Via Ch…Expected Critical Path Lengths in PERT Networks (1962)Expected Critical Path Length…Critical-Path Planning and Scheduling: Mathematical Basis (1961)Critical-Path Planning and Sc…A Network Flow Computation for Project Cost Curves (1961)A Network Flow Computation fo…Project time–cost trade-off scheduling: a hybrid optimization approach (2010)Project time–cost trade-off s…Project management with CPM and PERT (1965)A Simple CPM Time-Cost Tradeoff Algorithm (1971)The discrete time/cost trade-off problem: extensions and heuristic procedures (2007)Optimizing Construction Time and Cost Using Ant Colony Optimization Approach (2008)A review of methods and algorithms for optimizing construction scheduling (2013)Application of a Technique for Research and Development Program Evaluation (1959)Critical-Path Planning and Scheduling (1959)Bounding the Project Completion Time Distribution in PERT Networks (1985)Six decades of project management research: Thematic trends and future opportunities (2016)Project Management With Cpm, Pert and Precedence Diagramming (1983)The discrete time-cost tradeoff problem revisited (1995)Robust scheduling and robustness measures for the discrete time/cost trade-off problem (2010)Discrete time–cost–environment trade-off problem for large-scale construction systems with multiple modes under fuzzy uncertainty and its application to Jinping-II Hydroelectric Project (2012)MONTE CARLO METHODS AND THE PERT PROBLEM (1963)Activity networks: Project planning and control by network models (1977)On criticality and sensitivity in activity networks (2000)Robust optimization for resource-constrained project scheduling with uncertain activity durations (2012)New strategies for stochastic resource-constrained project scheduling (2017)Appropriate choice of aggregation operators in fuzzy decision support systems (2001)A genetic algorithm approach for the time-cost trade-off in PERT networks (2004)IPSSIS: An integrated multicriteria decision support system for equity portfolio construction and selection (2010)Project management with time, cost, and quality considerations (1996)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)Bounding Distributions for a Stochastic Acyclic Network (1971)Bounding distributions for a stochastic pert network (1977)The use of cutsets in Monte Carlo analysis of stochastic networks (1979)Stability and resource allocation in project planning (2004)Critical-path planning and scheduling (1959)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)An integrated survey of deterministic project scheduling (2001)A new approach for multiple objective decision making (1993)TOPSIS for MODM (1994)Multiple criteria decision-making techniques and their applications – a review of the literature from 2000 to 2014 (2015)
this work references cited by second hop

References

  • 1979Multiple Objective Decision Making — Methods and Applications1,186 cited
  • 1961Critical-Path Planning and Scheduling: Mathematical Basis902 cited
  • 1961A Network Flow Computation for Project Cost Curves366 cited
  • 1965Distribution of the Time Through a Directed, Acyclic Network221 cited
  • 1962Expected Critical Path Lengths in PERT Networks188 cited
  • 1986Markov and Markov-Regenerative pert Networks184 cited
  • 1996Optimal procedures for the discrete time/cost trade-off problem in project networks157 cited
  • 1975A Dynamic Programming Solution to Cost-Time Tradeoff for CPM154 cited
  • 1971Conditional Monte Carlo: A Simulation Technique for Stochastic Network Analysis153 cited
  • 1994Multiple Objective Decision Making119 cited
  • 1993Resource allocation via dynamic programming in activity networks117 cited
  • 1964Critical Path Analyses Via Chance Constrained and Stochastic Programming117 cited
  • 1981Project Scheduling with Continuously-Divisible, Doubly Constrained Resources113 cited
  • 1975Estimating the Mean and Variance of Subjective Distributions in PERT and Decision Analysis111 cited
  • 1972Critical Path Problems with Concave Cost-Time Curves

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

105 cited
  • 1967On the Expected Duration of PERT Type Networks100 cited
  • Cited by

    • 2010Project time–cost trade-off scheduling: a hybrid optimization approach38 cited