Two-Phase Differential Evolution for the Multiobjective Optimization of Time–Cost Tradeoffs in Resource-Constrained Construction Projects
16 references·4 citing·35 second hop
Two-Phase Differential Evolution for the Multiobjective Optimization of Time–Cost Tradeoffs in Resource-Constrained Construction Projects (2014)Two-Phase Differential Evolution for the …Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)Multi-mode resource-constrain…Stochastic Time-Cost-Resource Utilization Optimization Using Nondominated Sorting Genetic Algorithm and Discrete Fuzzy Sets (2009)Stochastic Time-Cost-Resource…Nondominated Archiving Multicolony Ant Algorithm in Time–Cost Trade-Off Optimization (2009)Nondominated Archiving Multic…Optimizing Construction Time and Cost Using Ant Colony Optimization Approach (2008)Optimizing Construction Time …A two-phase GA model for resource-constrained project scheduling (2008)A two-phase GA model for reso…A multi-mode resource-constrained discrete time–cost tradeoff problem and its genetic algorithm based solution (2008)A multi-mode resource-constra…Using Elitist Particle Swarm Optimization to Facilitate Bicriterion Time-Cost Trade-Off Analysis (2007)Using Elitist Particle Swarm …Particle swarm optimization for resource-constrained project scheduling (2005)Particle swarm optimization f…Particle swarm optimization-based schemes for resource-constrained project scheduling (2004)Particle swarm optimization-b…Using Machine Learning and GA to Solve Time-Cost Trade-Off Problems (1999)Using Machine Learning and GA…Optimization of construction time-cost trade-off analysis using genetic algorithms (1999)Optimization of construction …Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Using Genetic Algorithms to S…The LP/IP hybrid method for construction time-cost trade-off analysis (1996)The LP/IP hybrid method for c…Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Serial and parallel resource-…The discrete time-cost tradeoff problem revisited (1995)The discrete time-cost tradeo…Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method (1995)Construction Time-Cost Trade-…Multiple Objective Social Group Optimization for Time–Cost–Quality–Carbon Dioxide in Generalized Construction Projects (2021)Multiple Objective Social Gro…Machine learning-aided cost prediction and optimization in construction operations (2021)Machine learning-aided cost p…MULTI-OBJECTIVE SYMBIOTIC ORGANISMS OPTIMIZATION FOR MAKING TIME-COST TRADEOFFS IN REPETITIVE PROJECT SCHEDULING PROBLEM (2019)MULTI-OBJECTIVE SYMBIOTIC ORG…Multi‐Criteria Optimization (2014)Multi‐Criteria OptimizationCritical-Path Planning and Scheduling: Mathematical Basis (1961)Construction Resource Scheduling with Genetic Algorithms (1996)Fuzzy-multi-objective particle swarm optimization for time–cost–quality tradeoff in construction (2010)A hybrid genetic algorithm for the discrete time–cost trade-off problem (2012)A review of methods and algorithms for optimizing construction scheduling (2013)A Simple CPM Time-Cost Tradeoff Algorithm (1971)Stochastic Construction Time-Cost Trade-Off Analysis (2000)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)A competitive genetic algorithm for resource-constrained project scheduling (1998)An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem (2011)On the performance of bee algorithms for resource-constrained project scheduling problem (2011)Hybrid ant colony optimization in solving multi-skill resource-constrained project scheduling problem (2014)Activity networks: Project planning and control by network models (1977)Project Management With Cpm, Pert and Precedence Diagramming (1983)Complexity of the Discrete Time-Cost Tradeoff Problem for Project Networks (1997)A Classification Scheme for Project Scheduling (1999)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: A case study for a bridge construction project (2020)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Metaheuristics for project and construction management – A state-of-the-art review (2011)Optimizing project selection and scheduling problems with time-dependent resource constraints (2011)A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem (2013)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)A novel Multiple Objective Symbiotic Organisms Search (MOSOS) for time–cost–labor utilization tradeoff problem (2015)Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction (2016)Time–cost–quality trade-off analysis for planning construction projects (2019)Ant colony optimization for resource-constrained project scheduling (2002)Ant colony optimization-based multi-mode scheduling under renewable and nonrenewable resource constraints (2013)Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem (2016)A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization (2004)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)
this work references cited by second hop

References

  • 1996Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation701 cited
  • 1997Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems504 cited
  • 1999Optimization of construction time-cost trade-off analysis using genetic algorithms229 cited
  • 1995The discrete time-cost tradeoff problem revisited229 cited
  • 2012Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm215 cited
  • 2004Particle swarm optimization-based schemes for resource-constrained project scheduling181 cited
  • 1995Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method171 cited
  • 2005Particle swarm optimization for resource-constrained project scheduling168 cited
  • 2008Optimizing Construction Time and Cost Using Ant Colony Optimization Approach143 cited
  • 2008A two-phase GA model for resource-constrained project scheduling124 cited
  • 2007Using Elitist Particle Swarm Optimization to Facilitate Bicriterion Time-Cost Trade-Off Analysis121 cited
  • 2009Nondominated Archiving Multicolony Ant Algorithm in Time–Cost Trade-Off Optimization118 cited
  • 2009Stochastic Time-Cost-Resource Utilization Optimization Using Nondominated Sorting Genetic Algorithm and Discrete Fuzzy Sets112 cited
  • 1999

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Using Machine Learning and GA to Solve Time-Cost Trade-Off Problems
112 cited
  • 1996The LP/IP hybrid method for construction time-cost trade-off analysis112 cited
  • 2008A multi-mode resource-constrained discrete time–cost tradeoff problem and its genetic algorithm based solution93 cited
  • Cited by

    • 2021Multiple Objective Social Group Optimization for Time–Cost–Quality–Carbon Dioxide in Generalized Construction Projects40 cited
    • 2014Multi‐Criteria Optimization40 cited
    • 2021Machine learning-aided cost prediction and optimization in construction operations39 cited
    • 2019MULTI-OBJECTIVE SYMBIOTIC ORGANISMS OPTIMIZATION FOR MAKING TIME-COST TRADEOFFS IN REPETITIVE PROJECT SCHEDULING PROBLEM37 cited