Using Elitist Particle Swarm Optimization to Facilitate Bicriterion Time-Cost Trade-Off Analysis
12 references·16 citing·31 second hop
Using Elitist Particle Swarm Optimization to Facilitate Bicriterion Time-Cost Trade-Off Analysis (2007)Using Elitist Particle Swarm Optimization…Particle swarm optimization-based schemes for resource-constrained project scheduling (2004)Particle swarm optimization-b…Applying Pareto Ranking and Niche Formation to Genetic Algorithm-Based Multiobjective Time–Cost Optimization (2004)Applying Pareto Ranking and N…Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization (2004)Applying a Genetic Algorithm-…Optimization of construction time-cost trade-off analysis using genetic algorithms (1999)Optimization of construction …GA-Based Multicriteria Optimal Model for Construction Scheduling (1999)GA-Based Multicriteria Optima…Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Using Improved Genetic Algori…Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Using Genetic Algorithms to S…The discrete time-cost tradeoff problem revisited (1995)The discrete time-cost tradeo…Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method (1995)Construction Time-Cost Trade-…Project Management With Cpm, Pert and Precedence Diagramming (1983)Project Management With Cpm, …Precedence and Arrow Networking Techniques for Construction (1980)Precedence and Arrow Networki…A Network Flow Computation for Project Cost Curves (1961)A Network Flow Computation fo…NSGA-III based optimization model for balancing time, cost, and quality in resource-constrained retrofitting projects (2024)NSGA-III based optimization m…Multi-objective time–cost trade-off optimization for the construction scheduling with Rao algorithms (2023)Multi-objective time–cost tra…Development of Multi-Objective Scheduling Model for Construction Projects Using Opposition-Based NSGA III (2021)Development of Multi-Objectiv…Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods (2020)Optimizing time–cost in gener…Latin hypercube sampling-based NSGA-III optimization model for multimode resource constrained time–cost–quality–safety trade-off in construction projects (2020)Latin hypercube sampling-base…Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model (2020)Integrating Quality and Safet…Project scheduling with time, cost and risk trade-off using adaptive multiple objective differential evolution (2018)Project scheduling with time,…Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects (2017)Opposition multiple objective…Pareto Front Particle Swarm Optimizer for Discrete Time-Cost Trade-Off Problem (2016)Pareto Front Particle Swarm O…Two-Phase Differential Evolution for the Multiobjective Optimization of Time–Cost Tradeoffs in Resource-Constrained Construction Projects (2014)Two-Phase Differential Evolut…Hybrid multiple objective artificial bee colony with differential evolution for the time–cost–quality tradeoff problem (2014)Hybrid multiple objective art…An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation (2014)An Innovative Time-Cost-Quali…Planning-stage estimation of highway project duration on the basis of anticipated project cost, project type, and contract type (2010)Planning-stage estimation of …Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows (2010)Optimization of Project Time-…Stochastic Time-Cost-Resource Utilization Optimization Using Nondominated Sorting Genetic Algorithm and Discrete Fuzzy Sets (2009)Stochastic Time-Cost-Resource…Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search (2009)Multiobjective Optimization o…Critical-Path Planning and Scheduling: Mathematical Basis (1961)Construction Resource Scheduling with Genetic Algorithms (1996)Fuzzy-multi-objective particle swarm optimization for time–cost–quality tradeoff in construction (2010)A hybrid genetic algorithm for the discrete time–cost trade-off problem (2012)A review of methods and algorithms for optimizing construction scheduling (2013)A Simple CPM Time-Cost Tradeoff Algorithm (1971)Stochastic Construction Time-Cost Trade-Off Analysis (2000)Optimizing Construction Time and Cost Using Ant Colony Optimization Approach (2008)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)A competitive genetic algorithm for resource-constrained project scheduling (1998)An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem (2011)On the performance of bee algorithms for resource-constrained project scheduling problem (2011)Hybrid ant colony optimization in solving multi-skill resource-constrained project scheduling problem (2014)Activity networks: Project planning and control by network models (1977)Complexity of the Discrete Time-Cost Tradeoff Problem for Project Networks (1997)A Classification Scheme for Project Scheduling (1999)Multiple Attribute Decision Making (1981)Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)Cost Optimization in Projects with Repetitive Nonserial Activities (2001)Fuzzy sets (1965)Fuzzy sets (1996)Extraction of decision alternatives in construction management projects: Application and adaptation of NSGA-II and MOPSO (2011)An iterative scheduling technique for resource-constrained project scheduling (1992)Simulating Project Work Processes and Organizations: Toward a Micro-Contingency Theory of Organizational Design (1999)Project management with time, cost, and quality considerations (1996)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)
this work references cited by second hop

References

  • 1997Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems504 cited
  • 1983Project Management With Cpm, Pert and Precedence Diagramming400 cited
  • 1961A Network Flow Computation for Project Cost Curves366 cited
  • 2004Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization266 cited
  • 1999GA-Based Multicriteria Optimal Model for Construction Scheduling232 cited
  • 1999Optimization of construction time-cost trade-off analysis using genetic algorithms229 cited
  • 1995The discrete time-cost tradeoff problem revisited229 cited
  • 1997Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization209 cited
  • 2004Particle swarm optimization-based schemes for resource-constrained project scheduling181 cited
  • 1995Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method171 cited
  • 1980Precedence and Arrow Networking Techniques for Construction167 cited
  • 2004Applying Pareto Ranking and Niche Formation to Genetic Algorithm-Based Multiobjective Time–Cost Optimization141 cited

Cited by

  • 2009Stochastic Time-Cost-Resource Utilization Optimization Using Nondominated Sorting Genetic Algorithm and Discrete Fuzzy Sets112 cited
  • 2020Latin hypercube sampling-based NSGA-III optimization model for multimode resource constrained time–cost–quality–safety trade-off in construction projects

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

112 cited
  • 2009Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search106 cited
  • 2014Hybrid multiple objective artificial bee colony with differential evolution for the time–cost–quality tradeoff problem90 cited
  • 2010Planning-stage estimation of highway project duration on the basis of anticipated project cost, project type, and contract type78 cited
  • 2020Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model75 cited
  • 2020Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods71 cited
  • 2010Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows70 cited
  • 2017Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects69 cited
  • 2014Two-Phase Differential Evolution for the Multiobjective Optimization of Time–Cost Tradeoffs in Resource-Constrained Construction Projects68 cited
  • 2016Pareto Front Particle Swarm Optimizer for Discrete Time-Cost Trade-Off Problem60 cited
  • 2021Development of Multi-Objective Scheduling Model for Construction Projects Using Opposition-Based NSGA III59 cited
  • 2018Project scheduling with time, cost and risk trade-off using adaptive multiple objective differential evolution59 cited
  • 2024NSGA-III based optimization model for balancing time, cost, and quality in resource-constrained retrofitting projects58 cited
  • 2014An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation57 cited
  • 2023Multi-objective time–cost trade-off optimization for the construction scheduling with Rao algorithms54 cited