SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Hierarchical Rule‐Based Activity Duration Estimation
5 references·3 citing·36 second hop
Hierarchical Rule‐Based Activity Duration Estimation (1987)Hierarchical Rule‐Based Activity Duration…Project Scheduling Using Fuzzy Set Concepts (1984)Project Scheduling Using Fuzz…Project Management With Cpm, Pert and Precedence Diagramming (1983)Project Management With Cpm, …Probabilistic Estimating: Mathematics and Applications (1983)Probabilistic Estimating: Mat…Probability Concepts in Engineering Planning and Design (1975)Probability Concepts in Engin…Geography of domestication. Englewood Cliffs, New Jersey, USA, Prentice-Hall, Inc. (1970)Geography of domestication. E…Elicitation of subjective probabilities for economic risk analysis: An investigation (1993)Elicitation of subjective pro…State of the art in construction simulation (1992)State of the art in construct…Hybrid Expert System for Construction Planning and Scheduling (1990)Hybrid Expert System for Cons…Precedence and Arrow Networking Techniques for Construction (1980)Climatic Effects on Construction (1985)Factor Model of Construction Productivity (1987)Computer‐Aided Equipment Selection for Transporting and Placing Concrete (1993)Group Techniques for Program Planning (1975)Judgement under Uncertainty: Heuristics and Biases (1983)Judgement under Uncertainty: Heuristics and Biases (1985)Probability distributions of facilities management costs for whole life cycle costing in acute care NHS hospital buildings (2002)Assessing the Economic Rationality of Remanufacturing Products* (2008)Risk analysis in maintainability of high-rise buildings under tropical conditions using ensemble neural network (2016)Judgment under Uncertainty: Heuristics and Biases (1974)Judgment under Uncertainty: Heuristics and Biases (1975)AHP- and simulation-based budget determination procedure for public building construction projects (2008)Parametric Range Estimating of Building Costs Using Regression Models and Bootstrap (2008)Dynamic Regression Models for Prediction of Construction Costs (2009)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Fuzzy sets (1965)Practical Structural Reliability Techniques (1984)Statistical-Fuzzy Approach to Quantify Cumulative Impact of Change Orders (2002)Fuzzy Logic Approach for Activity Delay Analysis and Schedule Updating (2004)Construction Project Scheduling with Time, Cost, and Material Restrictions Using Fuzzy Mathematical Models and Critical Path Method (2009)Cyclone–Method for Modeling Job Site Processes (1977)Monte Carlo Technique with Correlated Random Variables (1992)Planning and analysis of construction operations (1992)Construction project simulation using CYCLONE (1998)Simplified Simulation System for Construction Projects (1998)Integrating Construction Operation and Context in Large-Scale Construction Using Hybrid Computer Simulation (2009)Structural Reliability Methods (1996)Error and uncertainty in modeling and simulation (2002)Measuring vulnerability to natural hazards: towards disaster resilient societies (2007)An iterative scheduling technique for resource-constrained project scheduling (1992)The discrete time-cost tradeoff problem revisited (1995)Simulating Project Work Processes and Organizations: Toward a Micro-Contingency Theory of Organizational Design (1999)Niche separation of seven lemur species in the eastern rainforest of Madagascar (1989)Conceptually enhanced simulations: A computer tool for science teaching (1993)Culture and nature at the Adelaide Zoo: at the frontiers of ‘human’ geography (2017)
this work references cited by second hop

References

  • 1975Probability Concepts in Engineering Planning and Design2,575 cited
  • 1983Project Management With Cpm, Pert and Precedence Diagramming400 cited
  • 1970Geography of domestication. Englewood Cliffs, New Jersey, USA, Prentice-Hall, Inc.125 cited
  • 1984Project Scheduling Using Fuzzy Set Concepts98 cited
  • 1983Probabilistic Estimating: Mathematics and Applications90 cited

Cited by

  • 1992State of the art in construction simulation50 cited
  • 1990Hybrid Expert System for Construction Planning and Scheduling44 cited
  • 1993Elicitation of subjective probabilities for economic risk analysis: An investigation20 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work