Nature-inspired metaheuristics for multiobjective activity crashing
13 references·1 citing·41 second hop
Nature-inspired metaheuristics for multiobjective activity crashing (2006)Nature-inspired metaheuristics for multio…Enriched workflow modelling and Stochastic Branch-and-Bound (2005)Enriched workflow modelling a…Pareto ant colony optimization with ILP preprocessing in multiobjective project portfolio selection (2004)Pareto ant colony optimizatio…Project Scheduling: A Research Handbook (2002)Project Scheduling: A Researc…A review of the contribution of Operational Research to Project Management (2002)A review of the contribution …A Stochastic Branch-and-Bound Approach to Activity Crashing in Project Management (2000)A Stochastic Branch-and-Bound…PSPLIB - A project scheduling problem library (1997)PSPLIB - A project scheduling…Complexity of the Discrete Time-Cost Tradeoff Problem for Project Networks (1997)Complexity of the Discrete Ti…Net-present-value cost/time tradeoff (1995)Net-present-value cost/time t…Multicriteria Decision-Aid. (1993)Multicriteria Decision-Aid.Multicriteria decision-aid. (1993)Multicriteria decision-aid.Project Management With Cpm, Pert and Precedence Diagramming (1983)Project Management With Cpm, …A Dynamic Programming Algorithm for Decision CPM Networks (1979)A Dynamic Programming Algorit…A CPM Time-Cost Computational Algorithm for Arbitrary Activity Cost Functions (1977)A CPM Time-Cost Computational…The Cost of Speed: Work Policies for Crashing and Overlapping in Product Development Projects (2015)The Cost of Speed: Work Polic…How to select and how to rank projects: The Promethee method (1986)Multicriteria Methodology for Decision Aiding (1996)A new system for weighting environmental criteria for use within ELECTRE III (1998)Paradigms and Challenges (2006)Fuzzy AHP-based multicriteria decision making systems using particle swarm optimization (2011)Multiple Criteria Decision Analysis (2016)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Management. Tasks, Responsibilities, Practices. (1975)The New Science of Management Decision (1978)Optimizing Discounted Cash Flows in Project Scheduling—An Ant Colony Optimization Approach (2009)Total Cost Control in Project Management via Satisficing (2013)Inter‐phase feedbacks in construction projects (2015)Simulation and the Monte Carlo Method (1981)Fast simulation of rare events in queueing and reliability models (1995)Modeling activity times by the Parkinson distribution with a lognormal core: Theory and validation (2011)Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming (2015)Simulation and the Monte Carlo Method (2016)A classification and review of approaches and methods for modeling uncertainty in projects (2019)Research and development project selection and resource allocation: a review of quantitative modelling approaches (1999)Interactive R&D portfolio analysis with project interdependencies and time profiles of multiple objectives (2003)A novel approach based on DEMATEL method and patent citation analysis for prioritizing a portfolio of investment projects (2014)Mitigating supply chain disruptions through the assessment of trade-offs among risks, costs and investments in capabilities (2015)Understand, reduce, respond: project complexity management theory and practice (2017)The discrete time-cost tradeoff problem revisited (1995)Optimal procedures for the discrete time/cost trade-off problem in project networks (1996)Robust scheduling and robustness measures for the discrete time/cost trade-off problem (2010)A hybrid genetic algorithm for the discrete time–cost trade-off problem (2012)An iterative scheduling technique for resource-constrained project scheduling (1992)Simulating Project Work Processes and Organizations: Toward a Micro-Contingency Theory of Organizational Design (1999)Ant colony optimization for resource-constrained project scheduling (2002)Project scheduling under uncertainty: Survey and research potentials (2004)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)A review of methods supporting supplier selection (2001)Handbook on Constructing Composite Indicators (2005)Handbook on Constructing Composite Indicators: Methodology and User Guide (2008)Robust and reactive project scheduling: a review and classification of procedures (2004)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (2019)Network decomposition-based benchmark results for the discrete time–cost tradeoff problem (2004)On the discrete time, cost and quality trade-off problem (2006)Project Management with Dynamic Scheduling (2012)
this work references cited by second hop

References

  • 1993Multicriteria Decision-Aid.1,403 cited
  • 1997PSPLIB - A project scheduling problem library1,309 cited
  • 2002Project Scheduling: A Research Handbook716 cited
  • 1983Project Management With Cpm, Pert and Precedence Diagramming400 cited
  • 1997Complexity of the Discrete Time-Cost Tradeoff Problem for Project Networks209 cited
  • 1993Multicriteria decision-aid.208 cited
  • 2004Pareto ant colony optimization with ILP preprocessing in multiobjective project portfolio selection166 cited
  • 2000A Stochastic Branch-and-Bound Approach to Activity Crashing in Project Management124 cited
  • 1979A Dynamic Programming Algorithm for Decision CPM Networks117 cited
  • 2002A review of the contribution of Operational Research to Project Management113 cited
  • 1977A CPM Time-Cost Computational Algorithm for Arbitrary Activity Cost Functions39 cited
  • 1995Net-present-value cost/time tradeoff38 cited
  • 2005Enriched workflow modelling and Stochastic Branch-and-Bound17 cited

Cited by

  • 2015The Cost of Speed: Work Policies for Crashing and Overlapping in Product Development Projects31 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work