SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia
16 references·1 citing·40 second hop
The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia (2012)The accuracy of preliminary cost estimate…Cost Studies of Buildings (2013)Cost Studies of BuildingsSurvival of the unfittest: why the worst infrastructure gets built--and what we can do about it (2009)Survival of the unfittest: wh…Construction Project Cost Escalation Factors (2009)Construction Project Cost Esc…The accuracy of pre‐tender building cost estimates in Australia (2008)The accuracy of pre‐tender bu…G*Power 3: A flexible statistical power analysis program for the social, behavioral, and biomedical sciences (2007)G*Power 3: A flexible statist…Investigation of Bid Price Competition Measured through Prebid Project Estimates, Actual Bid Prices, and Number of Bidders (2005)Investigation of Bid Price Co…Risk Analysis in Project Management (2003)Risk Analysis in Project Mana…Underestimating Costs in Public Works Projects: Error or Lie? (2002)Underestimating Costs in Publ…Procurement Systems — A guide to Best Practice in Construction (2001)Procurement Systems — A guide…Average‐Bid Method—Competitive Bidding Strategy (1993)Average‐Bid Method—Competitiv…Quantity Surveying Techniques: New Directions (1990)Quantity Surveying Techniques…Ethics and Advocacy in Forecasting for Public Policy (1990)Ethics and Advocacy in Foreca…Construction Contracts: Law and Management (1990)Construction Contracts: Law a…Risk analysis in project management (1987)Risk analysis in project mana…The accuracy of quantity surveyors' cost estimating (1984)The accuracy of quantity surv…Economic Theory and the Construction Industry (1974)Economic Theory and the Const…Hybrid machine learning approach for construction cost estimation: an evaluation of extreme gradient boosting model (2023)Hybrid machine learning appro…A Competitive-Bidding Strategy (1956)Contractor evaluation and selection: a Hong Kong perspective (1996)Optimized artificial intelligence models for predicting project award price (2015)COMPARING PUBLIC PROCUREMENT AUCTIONS (2018)A Desire Named Streetcar Fantasy and Fact in Rail Transit Planning (1992)Construction Claims and Disputes: Causes and Cost/Time Overruns (1994)Keeping it simple? A case study into the advantages and disadvantages of reducing complexity in mega project planning (2012)Predicting construction cost overruns using text mining, numerical data and ensemble classifiers (2014)Risk Paths in International Construction Projects: Case Study from Chinese Contractors (2016)Morality and the Ideal of Rationality in Formal Organizations (1970)The Power Broker: Robert Moses and the Fall of New York (1976)From Nobel Prize to Project Management: Getting Risks Right (2006)Curbing Optimism Bias and Strategic Misrepresentation in Planning: Reference Class Forecasting in Practice (2007)Design and Analysis: A Researcher's Handbook (1975)GPOWER: A general power analysis program (1996)Design and Analysis: A Researcher's Handbook (2005)Power failure: why small sample size undermines the reliability of neuroscience (2013)ESG and financial performance: aggregated evidence from more than 2000 empirical studies (2015)Effect size guidelines for individual differences researchers (2016)Timid Choices and Bold Forecasts: A Cognitive Perspective on Risk Taking (1993)Megaprojects and Risk (2003)Animal spirits: how human psychology drives the economy, and why it matters for global capitalism (2009)Does infrastructure investment lead to economic growth or economic fragility? Evidence from China (2016)GOVERNMENT QUALITY AND THE ECONOMIC RETURNS OF TRANSPORT INFRASTRUCTURE INVESTMENT IN EUROPEAN REGIONS (2016)The influence of local community stakeholders in megaprojects: Rethinking their inclusiveness to improve project performance (2017)Risk and risk management in construction: a review and future directions for research (1998)How procurement options influence risk management in construction projects (2011)Planning for sustainable stakeholder engagement based on the assessment of conflicting interests in projects (2019)Critical determinants of construction tendering costs: Quantity surveyors’ standpoint (2005)Predicting Construction Cost Using Multiple Regression Techniques (2006)Development of project cost contingency estimation model using risk analysis and fuzzy expert system (2010)A review of techniques for risk management in projects (2007)Evaluation of Risk Factors Leading to Cost Overrun in Delivery of Highway Construction Projects (2010)Flexible contracts to cope with uncertainty in public–private partnerships (2012)How common and how large are cost overruns in transport infrastructure projects? (2003)Directions for future research in project management: The main findings of a UK government-funded research network (2006)Should we build more large dams? The actual costs of hydropower megaproject development (2014)Predicting Changes in Construction Cost Indexes Using Neural Networks (1994)Industry financial ratios—application of factor analysis in Turkish construction industry (2005)Implementing public–private partnership (PPP) policy for public construction projects in Ghana: critical success factors and policy implications (2016)
this work references cited by second hop

References

  • 2007G*Power 3: A flexible statistical power analysis program for the social, behavioral, and biomedical sciences65,813 cited
  • 2002Underestimating Costs in Public Works Projects: Error or Lie?1,446 cited
  • 2009Survival of the unfittest: why the worst infrastructure gets built--and what we can do about it531 cited
  • 2013Cost Studies of Buildings287 cited
  • 2003Risk Analysis in Project Management270 cited
  • 1990Construction Contracts: Law and Management267 cited
  • 1974Economic Theory and the Construction Industry231 cited
  • 2009Construction Project Cost Escalation Factors222 cited
  • 1990Ethics and Advocacy in Forecasting for Public Policy203 cited
  • 1993Average‐Bid Method—Competitive Bidding Strategy118 cited
  • 2001Procurement Systems — A guide to Best Practice in Construction93 cited
  • 2008The accuracy of pre‐tender building cost estimates in Australia85 cited
  • 1987Risk analysis in project management79 cited
  • 2005Investigation of Bid Price Competition Measured through Prebid Project Estimates, Actual Bid Prices, and Number of Bidders74 cited
  • 1990Quantity Surveying Techniques: New Directions70 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 1984The accuracy of quantity surveyors' cost estimating67 cited
  • Cited by

    • 2023Hybrid machine learning approach for construction cost estimation: an evaluation of extreme gradient boosting model39 cited