Project cost–quality–risk tradeoff analysis in a time-constrained problem
16 references·13 citing·33 second hop
Project cost–quality–risk tradeoff analysis in a time-constrained problem (2016)Project cost–quality–risk tradeoff analys…A novel multi criteria decision making model for optimizing time–cost–quality trade-off problems in construction projects (2014)A novel multi criteria decisi…A new multi-objective multi-mode model for solving preemptive time–cost–quality trade-off project scheduling problems (2013)A new multi-objective multi-m…Discrete time–cost–environment trade-off problem for large-scale construction systems with multiple modes under fuzzy uncertainty and its application to Jinping-II Hydroelectric Project (2012)Discrete time–cost–environmen…A practical approach to project scheduling: considering the potential quality loss cost in the time–cost tradeoff problem (2011)A practical approach to proje…Fuzzy-multi-objective particle swarm optimization for time–cost–quality tradeoff in construction (2010)Fuzzy-multi-objective particl…Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Time-Cost-Quality Trade-Off A…Project scheduling : recent models, algorithms, and applications (1999)Project scheduling : recent m…A Classification Scheme for Project Scheduling (1999)A Classification Scheme for P…A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations (1998)A branch-and-bound procedure …Project management with time, cost, and quality considerations (1996)Project management with time,…The Analysis of Activity Networks Under Generalized Precedence Relations (GPRs) (1992)The Analysis of Activity Netw…Project Management With Cpm, Pert and Precedence Diagramming (1983)Project Management With Cpm, …Multiple Attribute Decision Making (1981)Multiple Attribute Decision M…A Network Flow Computation for Project Cost Curves (1961)A Network Flow Computation fo…Critical-Path Planning and Scheduling (1959)Critical-Path Planning and Sc…Critical-path planning and scheduling (1959)Critical-path planning and sc…Time-cost optimization in repetitive project scheduling with limited resources (2021)Time-cost optimization in rep…A novel time, cost, quality and risk tradeoff model with a knowledge-based hesitant fuzzy information: An R&D project application (2021)A novel time, cost, quality a…Time-cost-quality-environmental impact trade-off resource-constrained project scheduling problem with DEA approach (2020)Time-cost-quality-environment…Optimizing temporary work and overtime in the Time Cost Quality Trade-off Problem (2020)Optimizing temporary work and…Mean-conditional value at risk model for the stochastic project scheduling problem (2020)Mean-conditional value at ris…Buffer space hedging enabled production time variation coordination in prefabricated construction (2019)Buffer space hedging enabled …A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic (2019)A constraint programming appr…Time Cost Quality Trade-off Problems: A survey exploring the assessment of quality (2018)Time Cost Quality Trade-off P…Project scheduling with time, cost and risk trade-off using adaptive multiple objective differential evolution (2018)Project scheduling with time,…Modeling and analysis of cascading failures in projects: A complex network approach (2018)Modeling and analysis of casc…Integrated planning of project scheduling and material procurement considering the environmental impacts (2018)Integrated planning of projec…From project risk to complexity analysis: a systematic classification (2018)From project risk to complexi…A quantitative risk assessment methodology for construction project (2018)A quantitative risk assessmen…The analytic hierarchy process : planning, priority setting, resource allocation (1980)Decisions with Multiple Objectives: Preferences and Value Tradeoffs. (1994)Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS (2003)A multi-objective invasive weeds optimization algorithm for solving multi-skill multi-mode resource constrained project scheduling problem (2016)Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem (2016)Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization (2018)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Management Guide to PERT/CPM (1969)Time, cost and quality trade-off in project management: a case study (1999)Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution (2018)Application of a Technique for Research and Development Program Evaluation (1959)HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS (1989)When neighboring disciplines fail to learn from each other: The case of innovation and project management research (2018)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)A hybrid genetic algorithm for the discrete time–cost trade-off problem (2012)Activity networks: Project planning and control by network models (1977)Resource-constrained project scheduling: A survey of recent developments (1998)Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (2004)Project Scheduling—Theory and Practice (2005)A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem (2007)An iterative scheduling technique for resource-constrained project scheduling (1992)The discrete time-cost tradeoff problem revisited (1995)Simulating Project Work Processes and Organizations: Toward a Micro-Contingency Theory of Organizational Design (1999)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)MONTE CARLO METHODS AND THE PERT PROBLEM (1963)Distribution of the Time Through a Directed, Acyclic Network (1965)A Simple CPM Time-Cost Tradeoff Algorithm (1971)GIS‐based multicriteria decision analysis: a survey of the literature (2006)A state-of the-art survey of TOPSIS applications (2012)A hybrid setup for a hybrid scenario: combining heuristics for the home health care problem (2005)A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (2019)An updated survey of variants and extensions of the resource-constrained project scheduling problem (2021)
this work references cited by second hop

References

  • 1981Multiple Attribute Decision Making8,633 cited
  • 1959Critical-path planning and scheduling623 cited
  • 1983Project Management With Cpm, Pert and Precedence Diagramming400 cited
  • 1961A Network Flow Computation for Project Cost Curves366 cited
  • 2005Time-Cost-Quality Trade-Off Analysis for Highway Construction361 cited
  • 1999Project scheduling : recent models, algorithms, and applications352 cited
  • 1959Critical-Path Planning and Scheduling283 cited
  • 1996Project management with time, cost, and quality considerations274 cited
  • 2014A novel multi criteria decision making model for optimizing time–cost–quality trade-off problems in construction projects221 cited
  • 1999A Classification Scheme for Project Scheduling195 cited
  • 2010Fuzzy-multi-objective particle swarm optimization for time–cost–quality tradeoff in construction180 cited
  • 1992The Analysis of Activity Networks Under Generalized Precedence Relations (GPRs)156 cited
  • 1998A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations143 cited
  • 2013A new multi-objective multi-mode model for solving preemptive time–cost–quality trade-off project scheduling problems138 cited
  • 2012

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Discrete time–cost–environment trade-off problem for large-scale construction systems with multiple modes under fuzzy uncertainty and its application to Jinping-II Hydroelectric Project
122 cited
  • 2011A practical approach to project scheduling: considering the potential quality loss cost in the time–cost tradeoff problem120 cited
  • Cited by

    • 2018Project scheduling with time, cost and risk trade-off using adaptive multiple objective differential evolution59 cited
    • 2018Modeling and analysis of cascading failures in projects: A complex network approach57 cited
    • 2020Time-cost-quality-environmental impact trade-off resource-constrained project scheduling problem with DEA approach57 cited
    • 2018Integrated planning of project scheduling and material procurement considering the environmental impacts51 cited
    • 2019A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic51 cited
    • 2018A quantitative risk assessment methodology for construction project50 cited
    • 2020Mean-conditional value at risk model for the stochastic project scheduling problem40 cited
    • 2020Optimizing temporary work and overtime in the Time Cost Quality Trade-off Problem38 cited
    • 2018Time Cost Quality Trade-off Problems: A survey exploring the assessment of quality35 cited
    • 2021A novel time, cost, quality and risk tradeoff model with a knowledge-based hesitant fuzzy information: An R&D project application34 cited
    • 2018From project risk to complexity analysis: a systematic classification33 cited
    • 2021Time-cost optimization in repetitive project scheduling with limited resources32 cited
    • 2019Buffer space hedging enabled production time variation coordination in prefabricated construction19 cited