Stochastic Project Networks
0 references·11 citing·37 second hop
Stochastic Project Networks (1990)Stochastic Project NetworksNumerical Modeling of Business Processes Using the Apparatus of GERT Networks (2021)Numerical Modeling of Busines…An updated survey of variants and extensions of the resource-constrained project scheduling problem (2021)An updated survey of variants…The digital twin of the business process model (2020)The digital twin of the busin…Forecasting e-Learning Processes Using GERT Models and Process Mining Tools (2020)Forecasting e-Learning Proces…A survey of variants and extensions of the resource-constrained project scheduling problem (2009)A survey of variants and exte…A Survey of Activity Network‐Based Process Models for Managing Product Development Projects (2007)A Survey of Activity Network‐…Project Planning under Uncertainty Using Scenario Analysis (2005)Project Planning under Uncert…Modeling impacts of process architecture on cost and schedule risk in product development (2002)Modeling impacts of process a…Business Process Modeling and Analysis Using Gert Networks (2000)Business Process Modeling and…Dynamic scheduling of design activities with resource constraints (1997)Dynamic scheduling of design …Resource constrained scheduling of hierarchically structured design activity networks (1995)Resource constrained scheduli…Modelling business processes for the purpose of redesign (1994)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Modeling and Analysis Using Q-GERT Networks (1978)Managing Technologically Innovative Team Efforts Toward New Product Success (1990)PSPLIB - A project scheduling problem library (1997)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Project scheduling under uncertainty: Survey and research potentials (2004)Resource-constrained multi-project scheduling: Priority rule performance revisited (2010)A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (2019)Simulation Modeling and Analysis. (1983)Architectural Innovation: The Reconfiguration of Existing Product Technologies and the Failure of Established Firms (1990)A Comparison of Three Methods for Selecting Values of Input Variables in the Analysis of Output from a Computer Code (2000)Applying the design structure matrix to system decomposition and integration problems: a review and new directions (2001)Predicting Change Propagation in Complex Design (2001)Defining uncertainty in projects – a new perspective (2007)Project scheduling with resource constraints: A branch and bound approach (1987)Reengineering of design and manufacturing processes (1994)Engineering design management: An information structure approach (1999)A Dynamic Theory of Organizational Knowledge Creation (1994)The Management of Innovation (1994)Business Dynamics: Systems Thinking and Modeling for a Complex World (2000)Modularity and Commonality Research: Past Developments and Future Opportunities (2007)Improved Product Development Performance through Agile/Stage-Gate Hybrids: The Next-Generation Stage-Gate Process? (2014)The Transformation of the Innovation Process: How Digital Tools are Changing Work, Collaboration, and Organizations in New Product Development* (2020)Application of a Technique for Research and Development Program Evaluation (1959)A guide to the project management body of knowledge (PMBOK guide) (2004)Journal of Industrial Engineering (2017)Time Management of Infrastructure Recovery Schedules by Anticipation and Valuation of Disruptions (2018)The Strategy-Focused Organization: How Balanced Scorecard Companies Thrive in the New Business Environment (2000)Business process modelling with stochastic networks (2008)Business Process Management (2016)Operations Research -- An Introduction (1980)What Is Total Quality Control (1985)The New Economics: For Industry, Government, Education (1996)A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem (2022)Resource-constrained multi-project scheduling problem: A survey (2022)Extensions of the resource-constrained project scheduling problem (2023)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2009A survey of variants and extensions of the resource-constrained project scheduling problem904 cited
  • 2002Modeling impacts of process architecture on cost and schedule risk in product development489 cited
  • 2021An updated survey of variants and extensions of the resource-constrained project scheduling problem367 cited
  • 2007A Survey of Activity Network‐Based Process Models for Managing Product Development Projects217 cited
  • 1995Resource constrained scheduling of hierarchically structured design activity networks56 cited
  • 1997Dynamic scheduling of design activities with resource constraints35 cited
  • 2005Project Planning under Uncertainty Using Scenario Analysis24 cited
  • 2000Business Process Modeling and Analysis Using Gert Networks14 cited
  • 2020The digital twin of the business process model12 cited
  • 2021Numerical Modeling of Business Processes Using the Apparatus of GERT Networks8 cited
  • 2020Forecasting e-Learning Processes Using GERT Models and Process Mining Tools8 cited