SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Job Assignment Based on Brain Demands and Human Resource Strategies
16 references·2 citing·54 second hop
Job Assignment Based on Brain Demands and Human Resource Strategies (2016)Job Assignment Based on Brain Demands and…A risk perspective on human resource management: A review and directions for future research (2015)A risk perspective on human r…Workforce Planning Incorporating Skills: State of the Art (2014)Workforce Planning Incorporat…“Our Most Important Asset” (2013)“Our Most Important Asset”Optimizing linear project scheduling with multi-skilled crews (2012)Optimizing linear project sch…Cognitive Load Theory (2011)Cognitive Load TheoryA genetic algorithm-based method for scheduling repetitive construction projects (2009)A genetic algorithm-based met…The metabolic consequences of sleep deprivation (2007)The metabolic consequences of…Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)Use of Genetic Algorithms in …Reducing Variability to Improve Performance as a Lean Construction Principle (2002)Reducing Variability to Impro…Cost Optimization in Projects with Repetitive Nonserial Activities (2001)Cost Optimization in Projects…Scheduling Projects with Repeating Activities (1998)Scheduling Projects with Repe…Multiskilled Labor Utilization Strategies in Construction (1998)Multiskilled Labor Utilizatio…Construction Project Scheduling (1991)Construction Project Scheduli…Learning Curve Models of Construction Productivity (1986)Learning Curve Models of Cons…Analyses of Selected LHX Mission Functions: Implications for Operator Workload and System Automation Goals (1984)Analyses of Selected LHX Miss…The magical number seven, plus or minus two: Some limits on our capacity for processing information. (1956)The magical number seven, plu…Insidious Safety Threat of Fatigue: Investigating Construction Workers’ Risk of Accident Due to Fatigue (2021)Insidious Safety Threat of Fa…MANAGERIAL DRIVERS OF CHINESE LABOUR LOYALTY IN INTERNATIONAL CONSTRUCTION PROJECTS (2017)MANAGERIAL DRIVERS OF CHINESE…Cognitive Load During Problem Solving: Effects on Learning (1988)The magical number seven, plus or minus two: Some limits on our capacity for processing information. (1994)Does discovery-based instruction enhance learning? (2010)Cognitive Theory of Multimedia Learning (2014)The Past, Present, and Future of the Cognitive Theory of Multimedia Learning (2024)Professional Construction Management (1976)Construction Planning for Linear Projects (1980)Linear Scheduling Method for Highway Construction (1981)Challenges in Line-of-Balance Scheduling (2002)Optimal Planning and Scheduling for Repetitive Construction Projects (2005)The discrete time/cost trade-off problem: extensions and heuristic procedures (2007)Project scheduling with resource constraints: A branch and bound approach (1987)Some efficient multi-heuristic procedures for resource-constrained project scheduling (1990)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Optimizing Construction Time and Cost Using Ant Colony Optimization Approach (2008)Metaheuristics for project and construction management – A state-of-the-art review (2011)A review of methods and algorithms for optimizing construction scheduling (2013)The Pittsburgh sleep quality index: A new instrument for psychiatric practice and research (1989)Impact of sleep debt on metabolic and endocrine function (1999)Mortality Associated With Sleep Duration and Insomnia (2002)Quantity and Quality of Sleep and Incidence of Type 2 Diabetes (2009)Sleep duration and mortality: a systematic review and meta‐analysis (2009)Sleep Duration and All-Cause Mortality: A Systematic Review and Meta-Analysis of Prospective Studies (2010)Factors Affecting the Cost of Airplanes (1936)Impact of Material Management on Productivity—A Case Study (1989)Critical Review of Labor Productivity Research in Construction Journals (2013)An agent-based modeling approach for understanding the effect of worker-management interactions on construction workers' safety-related behaviors (2018)Factory Physics : Foundations of Manufacturing Management (1995)Lean Thinking—Banish Waste and Create Wealth in your Corporation (1997)Toyota production system: beyond large-scale production (1998)A SURVEY OF THE FACTORS AFFECTING THE PRODUCTIVITY OF CONSTRUCTION PROJECTS IN IRAN (2012)Implementation of lean construction techniques for minimizing the risks effect on project construction time (2013)Accident Case Retrieval and Analyses: Using Natural Language Processing in the Construction Industry (2019)Firm Resources and Sustained Competitive Advantage (1991)Dynamic capabilities and strategic management (1997)Firm resources and sustained competitive advantage (2004)Mapping Human Resource Management: Reviewing the field and charting future directions (2016)Strategic human resource management, human capital and competitive advantage: is the field going in circles? (2017)CEO narcissism and corporate social responsibility: Does CEO narcissism affect CSR focus? (2019)EXPERIMENTAL PSYCHOLOGY (1940)An Analysis of Perceptual Confusions Among Some English Consonants (1955)Working Memory (1974)A scaling method for priorities in hierarchical structures (1977)The theory of planned behavior (1991)Preliminaries to speech analysis (2020)THE LEARNING CURVE: HISTORICAL REVIEW AND COMPREHENSIVE SURVEY (1979)Organizational Learning: Creating, Retaining and Transferring Knowledge (1999)Organizational Learning (2012)State of the Art in Physician Scheduling (2016)Sustainable Operations (2016)Multi-skilling in scheduling problems: A review on models, methods and applications (2020)Mental Workload and ARL Workload Modeling Tools (2000)Mental workload measurement for emergency operating procedures in digital nuclear power plants (2013)Workload profiles: A continuous measure of mental workload (2016)
this work references cited by second hop

References

  • 1956The magical number seven, plus or minus two: Some limits on our capacity for processing information.17,866 cited
  • 2011Cognitive Load Theory5,538 cited
  • 2007The metabolic consequences of sleep deprivation1,367 cited
  • 2014Workforce Planning Incorporating Skills: State of the Art344 cited
  • 1998Scheduling Projects with Repeating Activities315 cited
  • 2002Reducing Variability to Improve Performance as a Lean Construction Principle223 cited
  • 1984Analyses of Selected LHX Mission Functions: Implications for Operator Workload and System Automation Goals185 cited
  • 2004Use of Genetic Algorithms in Resource Scheduling of Construction Projects184 cited
  • 2013“Our Most Important Asset”172 cited
  • 1986Learning Curve Models of Construction Productivity161 cited
  • 1991Construction Project Scheduling149 cited
  • 2001Cost Optimization in Projects with Repetitive Nonserial Activities147 cited
  • 2009A genetic algorithm-based method for scheduling repetitive construction projects129 cited
  • 1998Multiskilled Labor Utilization Strategies in Construction109 cited
  • 2015A risk perspective on human resource management: A review and directions for future research

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

105 cited
  • 2012Optimizing linear project scheduling with multi-skilled crews103 cited
  • Cited by

    • 2021Insidious Safety Threat of Fatigue: Investigating Construction Workers’ Risk of Accident Due to Fatigue84 cited
    • 2017MANAGERIAL DRIVERS OF CHINESE LABOUR LOYALTY IN INTERNATIONAL CONSTRUCTION PROJECTS13 cited