SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Finance-based scheduling: optimization of results-based funded multiple projects
16 references·0 citing·28 second hop
Finance-based scheduling: optimization of results-based funded multiple projects (2019)Finance-based scheduling: optimization of…A review of methods and algorithms for optimizing construction scheduling (2013)A review of methods and algor…Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows (2010)Optimization of Project Time-…A competency model for effectiveness in managing multiple projects (2008)A competency model for effect…Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Time-Cost-Quality Trade-Off A…Finance-Based Scheduling: Tool to Maximize Project Profit Using Improved Genetic Algorithms (2005)Finance-Based Scheduling: Too…Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)Use of Genetic Algorithms in …Finance-Based Scheduling of Construction Projects Using Integer Programming (2004)Finance-Based Scheduling of C…Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization (2004)Applying a Genetic Algorithm-…Using Machine Learning and GA to Solve Time-Cost Trade-Off Problems (1999)Using Machine Learning and GA…Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Optimization of Resource Allo…Optimization of construction time-cost trade-off analysis using genetic algorithms (1999)Optimization of construction …GA-Based Multicriteria Optimal Model for Construction Scheduling (1999)GA-Based Multicriteria Optima…Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Using Genetic Algorithms to S…Construction Resource Scheduling with Genetic Algorithms (1996)Construction Resource Schedul…Project and portfolio planning cycle (1994)Project and portfolio plannin…Construction performance control by networks (1976)Construction performance cont…Creating project plans to focus product development. (1992)Goals-and-methods matrix: coping with projects with ill defined goals and/or methods of achieving them (1993)Strategic Business Management through Multiple Projects (2004)Practices, Roles, and Responsibilities of Middle Managers in Program and Portfolio Management (2006)Kaizen: The key to Japan‚s competitive success (2009)Understanding project interdependencies: The role of visual representation, culture and process (2012)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Fuzzy-multi-objective particle swarm optimization for time–cost–quality tradeoff in construction (2010)A hybrid genetic algorithm for the discrete time–cost trade-off problem (2012)Project scheduling with resource constraints: A branch and bound approach (1987)Some efficient multi-heuristic procedures for resource-constrained project scheduling (1990)Optimizing Construction Time and Cost Using Ant Colony Optimization Approach (2008)Metaheuristics for project and construction management – A state-of-the-art review (2011)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)A review of methods, techniques and tools for project planning and control (2018)Time–cost–quality trade-off analysis for planning construction projects (2019)Latin hypercube sampling-based NSGA-III optimization model for multimode resource constrained time–cost–quality–safety trade-off in construction projects (2020)Multiple Attribute Decision Making (1981)Particle swarm optimization-based schemes for resource-constrained project scheduling (2004)Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)Fuzzy sets (1965)Fuzzy sets (1996)Extraction of decision alternatives in construction management projects: Application and adaptation of NSGA-II and MOPSO (2011)Schedule Optimization Using Genetic Algorithms (1991)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)A novel multi criteria decision making model for optimizing time–cost–quality trade-off problems in construction projects (2014)
this work references cited by second hop

References

  • 1997Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems504 cited
  • 1999Optimization of Resource Allocation and Leveling Using Genetic Algorithms421 cited
  • 2005Time-Cost-Quality Trade-Off Analysis for Highway Construction361 cited
  • 2004Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization266 cited
  • 1996Construction Resource Scheduling with Genetic Algorithms241 cited
  • 1999GA-Based Multicriteria Optimal Model for Construction Scheduling232 cited
  • 1999Optimization of construction time-cost trade-off analysis using genetic algorithms229 cited
  • 2004Use of Genetic Algorithms in Resource Scheduling of Construction Projects184 cited
  • 2013A review of methods and algorithms for optimizing construction scheduling148 cited
  • 1994Project and portfolio planning cycle148 cited
  • 1999Using Machine Learning and GA to Solve Time-Cost Trade-Off Problems112 cited
  • 2005Finance-Based Scheduling: Tool to Maximize Project Profit Using Improved Genetic Algorithms110 cited
  • 2004Finance-Based Scheduling of Construction Projects Using Integer Programming98 cited
  • 1976Construction performance control by networks94 cited
  • 2008A competency model for effectiveness in managing multiple projects

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

86 cited
  • 2010Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows70 cited
  • Cited by

    No citing works inside the corpus for this window.