Construction project scheduling under workspace interference
16 references·1 citing·40 second hop
Construction project scheduling under workspace interference (2020)Construction project scheduling under wor…An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances (2013)An experimental investigation…Project scheduling with finite or infinite number of activity processing modes – A survey (2010)Project scheduling with finit…Particle swarm optimization-based schemes for resource-constrained project scheduling (2004)Particle swarm optimization-b…A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)A new efficient simulated ann…Resource Scheduling Using Neural Dynamics Model of Adeli and Park (2001)Resource Scheduling Using Neu…A GA-based fuzzy optimal model for construction time–cost trade-off (2001)A GA-based fuzzy optimal mode…Stochastic Construction Time-Cost Trade-Off Analysis (2000)Stochastic Construction Time-…Optimization of construction time-cost trade-off analysis using genetic algorithms (1999)Optimization of construction …GA-Based Multicriteria Optimal Model for Construction Scheduling (1999)GA-Based Multicriteria Optima…CONSCOM: An OO Construction Scheduling and Change Management System (1999)CONSCOM: An OO Construction S…A genetic algorithm approach to a general category project scheduling problem (1999)A genetic algorithm approach …Scheduling Projects with Repeating Activities (1998)Scheduling Projects with Repe…Regularization Neural Network for Construction Cost Estimation (1998)Regularization Neural Network…Scheduling/Cost Optimization and Neural Dynamics Model for Construction (1997)Scheduling/Cost Optimization …Complexity of the Discrete Time-Cost Tradeoff Problem for Project Networks (1997)Complexity of the Discrete Ti…Packing Method for Resource Leveling (Pack) (1990)Packing Method for Resource L…Resilient Scheduling as a Response to Uncertainty in Construction Projects (2021)Resilient Scheduling as a Res…PSPLIB - A project scheduling problem library (1997)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Project scheduling under uncertainty: Survey and research potentials (2004)A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (2009)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)An updated survey of variants and extensions of the resource-constrained project scheduling problem (2021)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Construction Resource Scheduling with Genetic Algorithms (1996)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Fuzzy-multi-objective particle swarm optimization for time–cost–quality tradeoff in construction (2010)A hybrid genetic algorithm for the discrete time–cost trade-off problem (2012)A review of methods and algorithms for optimizing construction scheduling (2013)Professional Construction Management (1976)Construction Planning for Linear Projects (1980)Linear Scheduling Method for Highway Construction (1981)Challenges in Line-of-Balance Scheduling (2002)Optimal Planning and Scheduling for Repetitive Construction Projects (2005)The discrete time/cost trade-off problem: extensions and heuristic procedures (2007)Multiple Attribute Decision Making (1981)Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)A Nonparametric Approach to Pricing and Hedging Derivative Securities Via Learning Networks (1994)Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning (2004)Artificial Intelligence and Parametric Construction Cost Estimate Modeling: State-of-the-Art Review (2019)Fuzzy sets (1965)Fuzzy sets (1996)Bid/no-bid decision-making – a fuzzy linguistic approach (2004)Overview of the Application of “Fuzzy Techniques” in Construction Management Research (2009)Six decades of project management research: Thematic trends and future opportunities (2016)The discrete time-cost tradeoff problem revisited (1995)An integrated survey of deterministic project scheduling (2001)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Ant colony optimization for resource-constrained project scheduling (2002)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)Schedule Optimization Using Genetic Algorithms (1991)A competitive genetic algorithm for resource-constrained project scheduling (1998)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)A Novel Machine Learning Model for Estimation of Sale Prices of Real Estate Units (2015)
this work references cited by second hop

References

  • 2003A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version513 cited
  • 1998Scheduling Projects with Repeating Activities315 cited
  • 2010Project scheduling with finite or infinite number of activity processing modes – A survey282 cited
  • 1998Regularization Neural Network for Construction Cost Estimation255 cited
  • 1999GA-Based Multicriteria Optimal Model for Construction Scheduling232 cited
  • 1999Optimization of construction time-cost trade-off analysis using genetic algorithms229 cited
  • 1997Scheduling/Cost Optimization and Neural Dynamics Model for Construction224 cited
  • 1997Complexity of the Discrete Time-Cost Tradeoff Problem for Project Networks209 cited
  • 1999A genetic algorithm approach to a general category project scheduling problem187 cited
  • 2001A GA-based fuzzy optimal model for construction time–cost trade-off182 cited
  • 2013An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances181 cited
  • 2004Particle swarm optimization-based schemes for resource-constrained project scheduling181 cited
  • 2000Stochastic Construction Time-Cost Trade-Off Analysis158 cited
  • 2001Resource Scheduling Using Neural Dynamics Model of Adeli and Park

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

150 cited
  • 1990Packing Method for Resource Leveling (Pack)141 cited
  • 1999CONSCOM: An OO Construction Scheduling and Change Management System122 cited
  • Cited by

    • 2021Resilient Scheduling as a Response to Uncertainty in Construction Projects27 cited