SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Just-in-time : an executive briefing
0 references·5 citing·26 second hop
Just-in-time : an executive briefing (1986)Just-in-time : an executive briefingThe Industrial Relations Perspective on Lean Systems, Workers, and Unions (2021)The Industrial Relations Pers…Just-in-Time logistics of a supplier in the car manufacturing industry (1991)Just-in-Time logistics of a s…Embedding JIT into MRP (1991)Embedding JIT into MRPA comparative study of US manufacturing firms at various stages of just-in-time implementation (1991)A comparative study of US man…Just-in-time: Some marketing issues raised by a popular concept in production and distribution (1989)Just-in-time: Some marketing …Industrial Management (1948)Production and inventory management (1983)Unemployment, job satisfaction, and employee turnover: A meta-analytic test of the Muchinsky model. (1987)JIT purchasing in the Spanish auto components industry – Implementation patterns and perceived benefits (2000)A longitudinal examination of JIT purchasing practices (2005)The Critical Role of Information and Information Technology in Future Accelerated Radical Innovation (2006)Decision Systems for Inventory Management and Production Planning (1979)Decision Systems for Inventory Management and Production Planning (1979)Betriebswirtschaftliche Steuerungs- und Kontrollprobleme (1988)The benefits and costs of JIT sourcing (1996)Linear approach for solving a piecewise linear vendor selection problem of quantity discounts using lexicographic method (2005)Supply chain coordination and setup cost reduction in case of asymmetric information (2009)Marketing Management: Analysis, Planning and Control (1973)Marketing: An introductory text (1986)Marketing: An introductory text (1992)The Transition to Flexibility (1996)Sub‐contractor and customer sourcing and the occurrence of disturbances in firms’ inbound and outbound logistics flows (2003)Barriers for successful implementation of JIT: a manufacturer perspective (2014)International Journal of Production Research (1962)Managing and reducing total cycle time: models and analysis (1996)Simulation study of CONWIP for a cold rolling plant (1998)Toyota production system: beyond large-scale production (1998)Using the when/where rules in dual resource constrained systems for a hybrid push-pull control (2008)The Iron Cage Revisited: Institutional Isomorphism and Collective Rationality in Organizational Fields (1983)Situated Learning (1991)Dynamic capabilities and strategic management (1997)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 1991Embedding JIT into MRP54 cited
  • 1991A comparative study of US manufacturing firms at various stages of just-in-time implementation47 cited
  • 1991Just-in-Time logistics of a supplier in the car manufacturing industry30 cited
  • 1989Just-in-time: Some marketing issues raised by a popular concept in production and distribution30 cited
  • 2021The Industrial Relations Perspective on Lean Systems, Workers, and Unions3 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work