No open-access location is known for this record yet.
No open-access location is known for this record yet.
This paper reviews the pricing of high-occupancy toll (HOT) lanes and finds that 1) existing dynamic pricing adjusts every 3-15 minutes according to such parameters as speed, density, and/or volume, 2) tolls increase progressively with traffic to ensure free flow HOT lanes, 3) for multi-zone HOT lanes, tolls tend to be determined by the most congested zone, 4) the reaction of motorists to toll adjustments is either unspecified or oversimplified, and 5) a toll boundary is essential to mediate extreme fluctuations. Based on values of time savings and reliability, a novel toll scheme was proposed as a function of speed of general-purpose lanes; tolls in a selected 10-mile HOT corridor varied between $0.77 and $12.64 per use, of which the value of reliability accounted for 24% to 44% while that of time savings accounted for the remainder. The proposed toll scheme can be applied to time-of-day or dynamic HOT pricing.
Loading…
Stored only when both papers are in the corpus — 7 citations exist upstream.
Papers that cite the same references — the relational fallback while embeddings are still backfilling.
Imported from OpenAlex (CC0) — nothing here is generated.