SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Parade Game: Impact of Work Flow Variability on Trade Performance
4 references·16 citing·41 second hop
Parade Game: Impact of Work Flow Variability on Trade Performance (1999)Parade Game: Impact of Work Flow Variabil…Shielding Production: Essential Step in Production Control (1998)Shielding Production: Essenti…Lean Thinking—Banish Waste and Create Wealth in your Corporation (1997)Lean Thinking—Banish Waste an…Lean Thinking-Banish Waste and Create Wealth in Your Corporation. (1997)Lean Thinking-Banish Waste an…STROBOSCOPE: State and Resource Based Simulation of Construction Processes (1996)STROBOSCOPE: State and Resour…Value adding and non-value adding activities in turnaround maintenance process: classification, validation, and benefits (2019)Value adding and non-value ad…A cross-sector review on the use of value stream mapping (2017)A cross-sector review on the …Analysis of Workflow Variability and Its Impacts on Productivity and Performance in Construction of Multistory Buildings (2015)Analysis of Workflow Variabil…Takt Time Planning for Construction of Exterior Cladding (2013)Takt Time Planning for Constr…Analysis of Disruptions Caused by Construction Field Rework on Productivity in Residential Projects (2013)Analysis of Disruptions Cause…Causes of Variation in Construction Project Task Starting Times and Duration (2011)Causes of Variation in Constr…Work Flow Variation and Labor Productivity: Case Study (2010)Work Flow Variation and Labor…Improving construction workflow- The role of production planning and control (2009)Improving construction workfl…Investigating the relationship between planning reliability and project performance (2008)Investigating the relationshi…Developing a Resource Supply Chain Planning System for Construction Projects (2006)Developing a Resource Supply …An economic game theory model of subcontractor resource allocation behaviour (2006)An economic game theory model…Work Structuring to Achieve Integrated Product–Process Design (2004)Work Structuring to Achieve I…Value stream analysis of a re-engineered construction supply chain (2003)Value stream analysis of a re…Implications of Even Flow Production Methodology for U.S. Housing Industry (2003)Implications of Even Flow Pro…Reducing Variability to Improve Performance as a Lean Construction Principle (2002)Reducing Variability to Impro…More Just-in-Time: Location of Buffers in Structural Steel Supply and Construction Processes (1999)More Just-in-Time: Location o…Modern factor analysis (1960)An Index of Factorial Simplicity (1974)A First Course in Factor Analysis (2013)Transactional hazards, institutional change, and capabilities: Integrating the theories of the firm (2013)Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance (2017)Data-Driven Machine Learning Approach to Integrate Field Submittals in Project Scheduling (2020)An exploration towards a production theory and its application to construction (2000)THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL (2000)Improving construction productivity: a subcontractor's perspective (2014)How can ‘tasks made ready’ during lookahead planning impact reliable workflow and project duration? (2015)Factory Physics : Foundations of Manufacturing Management (1995)Toyota production system: beyond large-scale production (1998)A SURVEY OF THE FACTORS AFFECTING THE PRODUCTIVITY OF CONSTRUCTION PROJECTS IN IRAN (2012)Implementation of lean construction techniques for minimizing the risks effect on project construction time (2013)Reengineering Work: Don’t Automate, Obliterate (1990)Reengineering the corporation: A manifesto for business revolution (1993)Reengineering the Corporation: A Manifesto for Business Revolution (1994)Extent of the use of Lean concepts proposed for a value stream mapping application (2009)Aggregated construction supply chains: success factors in implementation of strategic partnerships (2010)Critical Review of Collaborative Working in Construction Projects: Business Environment and Human Behaviors (2010)The Toyota Way Fieldbook: A Practical Guide for Implementing Toyota's 4Ps (2005)What constitutes good production flow in construction? (2016)Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques (2019)Mapping the supply chain: Why, what and how? (2022)Simulation Modeling and Analysis. (1983)Discrete-Event System Simulation (1984)General-Purpose Systems for Effective Construction Simulation (1999)Object-oriented Simulation Model for Earthmoving Operations (2003)Methodology for Conducting Discrete-Event Simulation Studies in Construction Engineering and Management (2009)Theory of Modeling and Simulation (2018)International Journal of Production Research (1962)A Systematic Literature Review for Better Understanding of Lean Driven Sustainability (2018)Value stream mapping and system dynamics integration for manufacturing line modelling and analysis (2018)Enabling value stream mapping for internal logistics using multidimensional process mining (2019)A handbook for value chain research (2002)Lean manufacturing: context, practice bundles, and performance (2002)A literature and practice review to develop sustainable business model archetypes (2013)Lean project management (2003)Delay Mitigation in the Malaysian Construction Industry (2006)The Underlying Theory of Project Management Is Obsolete (2008)Defining and developing measures of lean production (2007)
this work references cited by second hop

References

  • 1997Lean Thinking—Banish Waste and Create Wealth in your Corporation3,375 cited
  • 1997Lean Thinking-Banish Waste and Create Wealth in Your Corporation.1,836 cited
  • 1998Shielding Production: Essential Step in Production Control510 cited
  • 1996STROBOSCOPE: State and Resource Based Simulation of Construction Processes343 cited

Cited by

  • 2002Reducing Variability to Improve Performance as a Lean Construction Principle223 cited
  • 2017A cross-sector review on the use of value stream mapping138 cited
  • 2010Work Flow Variation and Labor Productivity: Case Study138 cited
  • 2011Causes of Variation in Construction Project Task Starting Times and Duration137 cited
  • 2013Takt Time Planning for Construction of Exterior Cladding133 cited
  • 2003Value stream analysis of a re-engineered construction supply chain132 cited
  • 2008Investigating the relationship between planning reliability and project performance105 cited
  • 2006An economic game theory model of subcontractor resource allocation behaviour94 cited
  • 2004Work Structuring to Achieve Integrated Product–Process Design81 cited
  • 2009Improving construction workflow- The role of production planning and control79 cited
  • 2015

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Analysis of Workflow Variability and Its Impacts on Productivity and Performance in Construction of Multistory Buildings
78 cited
  • 2006Developing a Resource Supply Chain Planning System for Construction Projects76 cited
  • 1999More Just-in-Time: Location of Buffers in Structural Steel Supply and Construction Processes70 cited
  • 2013Analysis of Disruptions Caused by Construction Field Rework on Productivity in Residential Projects67 cited
  • 2019Value adding and non-value adding activities in turnaround maintenance process: classification, validation, and benefits62 cited
  • 2003Implications of Even Flow Production Methodology for U.S. Housing Industry62 cited